City of Waterbury Public Works
Heavy Duty In-Ground Lift, Lubrication System

The City of Waterbury built a new state of the art Public Works Facility and new maintenance garage for both the town vehicles and town fire vehicles. We worked throughout the various stages of the project coordinating with other trades and the General Contractor to make sure the project was a success.
Ray-Jurgen worked with the town, project engineers and general contractor to provide vehicles lifting systems that would accommodate their growing fleet from smallest sedan to their largest trucks. These included light duty two-post lifts, four-post lifts and a heavy-duty 3 piston in-ground lift.
We also provided and installed a full fluid dispensing system for 12 fresh fluids, used fluid removal system and overflow protection system. This part of the project included fluid tanks, pumps, fluid reels, fluid bars and piping throughout the facility. This allows the technicians easy access to vehicle fluids throughout the facility.
We worked in various stages of the project coordinating with other trades to make sure we played our part in making sure the project was a success.